EN

Guardian for new distribution centre Gazeley

cases
Referentie

Referenceproject with Guardian

Our relation, ZND Dakbedekking B.V., has realized the new construction of distribution centre Gazeley in Venray.

A flat roof of 22000 m2, build-up:

  • a steel deck;
  • PE vapor barrier;
  • 140 mm Unilin PIR insulation;
  • Guardian R75 tube + BS screw;
  • PVC membrame;
  • Guardian RB48 tube + BS screw.

The insulation is mechanically fastened with the Guardian R75 tube combined with the Guardian BS screw.

The roofing membrane is mechanically fastened with the Guardian RB 48 (high performance) tube also combined with the Guardian BS screw.

Ref